SPECS AND RESPONSIBILITIES

 

Owner Responsibilities

  1. Payment: 50% Down payment due upon Order...remaining 50% due upon Delivery

  2. Contractor Coordination: All subcontractors are required to contact PIFE Inc. at earliest convenience for detailed explanation and time frame expectations

  3. Day of Install: Provide (2) Laborers to assist with unloading and assembly - 10 hrs max

  4. Day of Install: Provide Pallet Jack to move oven into position. Along with timbers and blocks for handling: (2) 4x4x6’ long timbers & (8) 4x4x6” blocks cut from previous drops

 

HVAC Contractor

  1. 1000 cfm of exhaust is needed per Window...MAX. Need the ability to slow the system

  2. Comparable make up air is required for restaurant environment

  3. 16” round penetration in exhaust plenum is provided for duct work at top of oven

  4. Provide exhaust penetration through ceiling, ready for easy connection after oven install

 

Electrical Contractor

  1. 120 V dedicated circuit for oven itself within 6’ of oven (see detail in owner’s manual)

  2. Choice on using the Rotoflex Relay or an existing switch to power the exhaust hood

  3. Based upon previous...120 V dedicated circuit for exhaust fan (may vary by location)