SPECS AND RESPONSIBILITIES
Owner Responsibilities
-
Payment: 50% Down payment due upon Order...remaining 50% due upon Delivery
-
Contractor Coordination: All subcontractors are required to contact PIFE Inc. at earliest convenience for detailed explanation and time frame expectations
-
Day of Install: Provide (2) Laborers to assist with unloading and assembly - 10 hrs max
-
Day of Install: Provide Pallet Jack to move oven into position. Along with timbers and blocks for handling: (2) 4x4x6’ long timbers & (8) 4x4x6” blocks cut from previous drops
HVAC Contractor
-
1000 cfm of exhaust is needed per Window...MAX. Need the ability to slow the system
-
Comparable make up air is required for restaurant environment
-
16” round penetration in exhaust plenum is provided for duct work at top of oven
-
Provide exhaust penetration through ceiling, ready for easy connection after oven install
Electrical Contractor
-
120 V dedicated circuit for oven itself within 6’ of oven (see detail in owner’s manual)
-
Choice on using the Rotoflex Relay or an existing switch to power the exhaust hood
-
Based upon previous...120 V dedicated circuit for exhaust fan (may vary by location)